Menu
Theme

notes-measurements-dce-s23-l-6ab-c

0% Complete
File Details
  • UPLOADED BY Unknown
  • DATE 06 Dec 2025
  • SIZE 0.58 MB
  • DOWNLOADS 1
  • TAGS
    notes
About This Document

Document Type: This is a Study Notes, designed for Reviewing core curriculum material.

Context: Core educational material suitable for current academic requirements.

Key Content: Likely covers essential definitions, technical implementation, and theoretical concepts necessary for mastery of the subject.

Study Strategy: Summarize these notes into flashcards or mind maps to aid active recall and long-term retention.

Recommendation: comprehensive resource for students aiming to deepen their understanding of General Studies.

4,388 words

Detailed Content Overview

22 min read Intermediate Level 4,388 words
Introduction

This notes resource titled "notes-measurements-dce-s23-l-6ab-c" provides comprehensive exam preparation materials designed to test and enhance your understanding. This resource is structured to facilitate effective learning and retention of important information.

Key Topics Covered
1 PRINCIPLES OF TAKING OFF - Bills of quantities shall fully descr
Learning Objectives
  • Master key concepts required for examination success
  • Practice answering exam-style questions effectively
  • Develop time management skills for timed assessments
  • Identify and address knowledge gaps in understanding
Detailed Summary

THE ELDORET NATIONAL POLYTECHNIC UNIT; MEASUREMENT OF WORKS & COST ESTIMATION. COURSE; DCE S23 CBET L6A, B & C LECTUTER; MR. Roles of Professionals Involved in Construction Roles of a Quantity Surveyor during t h e Pre-construction Period i. Preliminary estimates of the project i. bills of approximate quantities ii. Preparation of project schedule or work program. Gives initial c o s t advice on a project iv. Preparation of tender documents v. Advice on the selection of the most competitive bidder vi. Negotiates with potential /prospective contractors Roles of QS during Construction i. Re-measurement of work to establish final quantities. Cost control to ensure the project stays within budget. Checks on day works to establish the amount payable to the contractor. He is much c o n c e r n e d with fluctuations and claims. Acts as an arbitrator helping the parties involved in the project settle disputes as they arise.

Study Tips & Recommendations
Time Management

Practice under timed conditions to improve speed and accuracy. Allocate specific time limits to each section.

Active Practice

Attempt all questions before checking answers. Review mistakes to understand where improvements are needed.

Mark Scheme Review

Study marking schemes carefully to understand how examiners award points and structure your answers accordingly.

Regular Review

Schedule periodic reviews to reinforce learning and combat forgetting. Use spaced repetition for optimal retention.

Content Preview

THE ELDORET NATIONAL POLYTECHNIC UNIT; MEASUREMENT OF WORKS & COST ESTIMATION. COURSE; DCE S23 CBET L6A, B & C LECTUTER; MR. MUTAI. Roles of Professionals Involved in Construction Roles of a Quantity Surveyor during t h e Pre-construction Period i. Preliminary estimates of the project i.e. bills of approximate quantities ii. Preparation of project schedule or work program. iii. Gives initial c o s t advice on a project iv. Preparation of tender documents v. Advice on the selection of the most co...

0.0 (0 ratings)
Discussion
Login to join the discussion.

No comments yet. Be the first to start the conversation!

Share with Friends

Help others find this resource!

Share on WhatsApp
KenyanEdu
Add KenyanEdu to Home Screen
For offline access and faster experience