big-data-management-past-papers
File Details
-
UPLOADED BY Unknown
-
DATE 06 Dec 2025
-
SIZE 0.89 MB
-
DOWNLOADS 0
-
TAGS
notes
About This Document
Document Type: This is a Past Paper, designed for Reviewing previous question patterns.
Context: Standard material from the 2024 academic period.
Key Content: Likely covers essential definitions, structured questions to test your proficiency.
Study Strategy: Attempt these questions under timed conditions to simulate a real exam environment, then check against your notes.
Recommendation: comprehensive resource for students aiming to deepen their understanding of General Studies.
Detailed Content Overview
Introduction
This notes resource titled "big-data-management-past-papers" provides comprehensive exam preparation materials designed to test and enhance your understanding. This resource is structured to facilitate effective learning and retention of important information.
Key Topics Covered
Learning Objectives
- Master key concepts required for examination success
- Practice answering exam-style questions effectively
- Develop time management skills for timed assessments
- Identify and address knowledge gaps in understanding
Detailed Summary
CISSE ADVANCED LEVEL ELECTIVE I BIG DATA MANAGEMENT MONDAY: 2 December 2024. This paper has two sections. SECTION I has twenty (20) short response questions carrying forty (40) marks. SECTION II has three (3) practical questions carrying sixty (60) marks. Marks allocated to each question are indicated in the question. ke Required Resources: • Python Software • PySpark library • Hadoop software • Jupyter Notebook • Pycharm IDE • Java JDK w. c SECTION I (40 MARKS) The primary interface for a user to describe a MapReduce job to the Hadoop framework for execution is called ___________. The Hadoop component that is responsible for triggering the workflow actions, which in turn uses the Hadoop execution engine to execute the task is know__________________. In the Hadoop File System, which command would you use to create a directory named “cisseBDM” in the present working directory. The data integration tools that extract data and load it into a data lake for transformation and analysis used in the data warehouse architecture are known as __________________.
Study Tips & Recommendations
Time Management
Practice under timed conditions to improve speed and accuracy. Allocate specific time limits to each section.
Active Practice
Attempt all questions before checking answers. Review mistakes to understand where improvements are needed.
Mark Scheme Review
Study marking schemes carefully to understand how examiners award points and structure your answers accordingly.
Regular Review
Schedule periodic reviews to reinforce learning and combat forgetting. Use spaced repetition for optimal retention.
Content Preview
CISSE ADVANCED LEVEL ELECTIVE I BIG DATA MANAGEMENT MONDAY: 2 December 2024. Morning Paper. Time Allowed: 3 hours. Answer ALL questions. This paper has two sections. SECTION I has twenty (20) short response questions carrying forty (40) marks. SECTION II has three (3) practical questions carrying sixty (60) marks. Marks allocated to each question are indicated in the question. o. ke Required Resources: • Python Software • PySpark library • Hadoop software • Jupyter Notebook • Pycharm IDE • Java...
No comments yet. Be the first to start the conversation!